DESIGN
MD-1 Bridge in Nowy Sącz
Updating the technical documentation for the task: GP class street (main road of accelerated traffic) connecting DK75 with Marcinowicka Street within the city boundaries of Nowy Sącz, along with the drafting of materials required for the ZRID (Permission for Road Investment Project Implementation) decision making process
Location
Nowy Sącz, Poland
Purchaser
Municipal Road Administration in Nowy Sącz
The Contractor
Intercor sp. z o.o.
Lead design office
Silesia Engineering sp. z o.o.
Date of implementation
2012-2016
Builiding characteristics
Parameters

– massive concrete supports.
– The total length of the facility is 877.40 m
– Theoretical spans of the facility: 46.0 + 2×56.0 + 55.4 + 5×55.2 + 46.0 + 60.0 + 110.0 + 60 + 2×51.20 = 138.0 m
– Total width of the facility: 14.4m
– Foundation: on large diameter piles

Scope of work

Development of complete technical documentation along with attainment of administrative decisions in the scope of:

– Construction of bridge MD-7, MD-4, MD-5, PG-6, MD-8

– Construction of sanitary, gas and drainage systems

– Construction of acoustic protection– Reconstruction of the power grid

– Reconstruction of the lineside power supply (LPS)

– Development of an environmental impact report

– Drafting of geotechnical opinions, documentation of subsoil research