Development of complete technical documentation along with obtaining administrative decisions in the field of:
– Construction of the W-1, W-2, W-3, W-4, T-5A, T-5B, W-6, W-7 viaducts located in the area of mining damage
– Construction of KW-1, KW-II, KW-III inspection chambers, with a foundation depth of up to 13m below the ground level, performed as part of the reconstruction of the water main from DN1400 to DN1200
– securing the stability of slopes and the foundation of the designed road embankments