DESIGN
Design documentation of GOH 1 / GOH2 bridges in Central African Republic
Development and asphalting study of the Baoro – Bouar road (58.254km) including the crossing of Bouar and the construction of two engineering structures crossing the two rivers “Wen” and „Lobaye”: – GOH 1 – bridge on the Wen river – GOH2 – bridge on the Lobaye rive
Location
Central African Republic
Purchaser
Central African Ministry of Public Works
The Contractor
SOGEA SATOM (VINCI)
Lead design office
WSP France | subcontractor Geokonstrukcja sp. z o.o.
Date of implementation
2019-2020
Builiding characteristics
– The total length of the object: GOH-1: 84.02m GOH-2: 50,66m – The total width of the object: GOH-1: 11.00m GOH-2: 11,20m – Obstacle type: river Theoretical span of the superstructures: GOH-1: 20.66m x 21.34m x 21.34m x 20.66m GOH-2: 20,00m x 20,00 m Static scheme: GOH-1: four-span continuous system GOH-2: two-span continuous system Type of superstructure: prefabricated beams Foundation: GOH-1: large diameter drilled piles GOH-2: direct foundation
Parameters
Scope of work

Preparation of design documentation in the scope of detailed design with elements of static calculations